Skip to content
Updated 17 Sept 2026

Who won the Expo 2027 contracts

Belgrade is buying an Expo in public, one tender at a time. This is the award record we have been able to verify — who was paid, for what, how much, and against how many rival bids — reconciled from scattered announcements into one comparable table.

7
packages in the ledger
13
companies named as winner or subcontractor
6
are firm awards — the rest are framework ceilings
2
awards went to a group of bidders, counted once each
There is no total on this page, deliberately. Adding these rows together would produce a number that looks like "the cost of Expo 2027" and is not: the ledger is incomplete, one row is a spending ceiling rather than spending, and national pavilions — funded by each country itself — are excluded entirely. Every award below was made by EXPO 2027 Belgrade d.o.o., the state-owned company organising the exhibition. Values are as reported by Serbian media from the procurement record, excluding VAT unless stated. This is not a complete register of Expo spending: it covers the packages we have been able to source and verify, and it excludes national pavilions, which each country funds itself.

The award ledger

Largest first. Every value is as reported from the procurement record, excluding VAT. Follow a company name for the profile we hold on it; follow the sources column for the original report.

Package Awarded to Value Status Date Bids Sources
Collective pavilions — design, construction, operation and dismantling Sigong Tech Co., Ltd. (South Korea)
subcontractor: BAUMEISTER d.o.o. Beograd
5,280,000,000 RSD Awarded 31 Jul 2026 6 [1] [2]
Opening and closing ceremonies Balich Wonder Studio (Italy) 2,323,514,160 RSD
≈ €19.77M
Awarded 20 Feb 2026 4 [1] [2] [3]
Logistics partner (framework agreement) Intereuropa — logističke usluge a.d. Dobanovci 530,882,000 RSD Framework ceiling 1 Sept 2026 [1] [2]
Laundry and dry-cleaning, EXPO Village Marera Cleaning d.o.o.
TRUD NNR d.o.o. Beograd
BAHA d.o.o. Beograd
Lična d.o.o.
ABM Washing d.o.o.
401,523,628 RSD Awarded 31 Aug 2026 [1] [2]
Construction supervision and quality control (three zones) Arhi Nova d.o.o. Beograd 261,700,000 RSD Awarded 3 Sept 2026 [1] [2]
EXPO Village accommodation operator Aurion Service d.o.o. Beograd
Delta Hospitality d.o.o. Beograd
234,645,045 RSD Awarded 5 Aug 2026 [1] [2]
Production and printing of non-personalised tickets Institute for Manufacturing Banknotes and Coins – Topčider (Zavod za izradu novčanica i kovanog novca) 38,200,000 RSD Awarded 18 Aug 2026 [1] [2]

What each contract actually covers

The table gives the number; this gives the job. Where a figure needs a caveat, the caveat is here rather than in a footnote nobody reads.

Collective pavilions — design, construction, operation and dismantling

Project documentation, exhibition design, construction, operational management, maintenance and dismantling of the collective pavilions — the buildings that house every participating country without its own structure.

Awarded: 5,280,000,000 RSD excluding VAT , to Sigong Tech Co., Ltd. (South Korea), 31 Jul 2026 , from 6 bids.

Two lots: zone A (~RSD 2.34bn) and zone B plus the small individual pavilions in zone A (~RSD 2.9bn). The lot figures are rounded as reported and do not add exactly to the reported total.

Named subcontractor: BAUMEISTER d.o.o. Beograd. A subcontractor's share is not published and is not added to the figure above.

Verified 17 Sept 2026 against source 1 , source 2 .

Opening and closing ceremonies

Organisation and production of the opening and closing ceremonies. The same studio produced the Milano-Cortina 2026 Winter Olympics opening ceremony and the 2022 FIFA World Cup opening in Doha.

Awarded: 2,323,514,160 RSD excluding VAT (approximately €19.77 million), to Balich Wonder Studio (Italy), 20 Feb 2026 , from 4 bids.

Verified 17 Sept 2026 against source 1 , source 2 , source 3 .

Logistics partner (framework agreement)

Management of vehicle, goods, material and equipment flows to, from and within the Surčin site: delivery coordination, warehousing, customs warehouse management and customs services, plus staff, machinery, vehicles and the software to run it.

Framework ceiling: 530,882,000 RSD excluding VAT , to Intereuropa — logističke usluge a.d. Dobanovci, 1 Sept 2026 . Term: 15 months, October 2026 – December 2027.

This is a ceiling, not spending. The organiser describes this figure as the estimated maximum value of the services; actual payments follow demand. It is a ceiling, not spending.

Verified 17 Sept 2026 against source 1 , source 2 .

Laundry and dry-cleaning, EXPO Village

Daily collection, washing or dry-cleaning, drying, ironing and return of linen from the EXPO Village residential buildings in Surčin throughout the period they are in use.

Awarded: 401,523,628 RSD excluding VAT , to Marera Cleaning d.o.o. and TRUD NNR d.o.o. Beograd and BAHA d.o.o. Beograd and Lična d.o.o. and ABM Washing d.o.o., 31 Aug 2026 .

One award to a group of five bidders — counted once here, not five times.

Verified 17 Sept 2026 against source 1 , source 2 .

Construction supervision and quality control (three zones)

Technical control of project documentation, site supervision and quality verification across the Best Practice zone, the international participants zone and the thematic zone: materials, equipment and completed works, deadlines, contractual obligations, coordination and risk management on the investor's behalf.

Awarded: 261,700,000 RSD excluding VAT , to Arhi Nova d.o.o. Beograd, 3 Sept 2026 .

Verified 17 Sept 2026 against source 1 , source 2 .

EXPO Village accommodation operator

Running the 1,500-unit EXPO Village residential complex for participants: reservations, reception, check-in and check-out, guest communication, additional services and the financial-administrative side, with staff, equipment, software and licences.

Awarded: 234,645,045 RSD excluding VAT , to Aurion Service d.o.o. Beograd and Delta Hospitality d.o.o. Beograd, 5 Aug 2026 .

One award to a group of two bidders — counted once here, not twice.

Verified 17 Sept 2026 against source 1 , source 2 .

Production and printing of non-personalised tickets

1,000,000 one-day tickets, 200,000 three-day tickets and 800,000 blank forms, printed on protected paper with watermarks, holographic foil, QR codes, perforation, serial numbering and UV security elements, for sale at physical points of sale and box offices.

Awarded: 38,200,000 RSD excluding VAT , to Institute for Manufacturing Banknotes and Coins – Topčider (Zavod za izradu novčanica i kovanog novca), 18 Aug 2026 .

The same tender's delivery schedule produced the 15 September 2026 sales-start date, which passed without a launch.

Verified 17 Sept 2026 against source 1 , source 2 .

What is not in here yet

Packages we know exist but have not verified to the standard above, and the ones that fall outside this ledger's scope.

PackageWhat has been reportedWhy it is not in the ledger
Global PR and communications frameworkMC Group (Berlin) with Stratcom International, reported at RSD 69.5m as a framework agreementReported but not yet verified against a procurement source we can cite — held out of the ledger until it is.
Korean Pavilion exhibition servicesKOTRA tender, KRW 9bn, bids closed 29 April 2026A national-pavilion contract, so out of scope for this ledger; the winner is also still unpublished.
Turkmenistan pavilion design and constructionInternational tender re-announced, applications closed 13 April 2026National-pavilion procurement, run in Ashgabat — out of scope, winner unpublished.

How this ledger is kept

Five rules, applied to every row. A consortium award is counted once, with every member named — two of the awards here went to groups of bidders, and counting the companies instead of the contracts would inflate the record. A subcontractor's work is never added to the prime contract's value. A framework agreement is labelled a ceiling, because that is what the organiser says it is. Nothing enters without a source we have read and a date we checked it. And there is no total, because an incomplete ledger cannot produce one honestly.

The scope is the organiser's own procurement — contracts awarded by EXPO 2027 Belgrade d.o.o. National pavilions are each funded by the participating country and are tracked separately, on the pavilion profiles; Serbian state construction contracts awarded by ministries, including the host country's own pavilion, are a different pot of money and are not mixed in here.

Corrections are welcome and acted on: if you are one of the companies above and a detail is wrong, tell us and we will fix it. The raw data is published as JSON and is free to reuse with attribution.

Related